Performance testing of edge banding machines includes aspects such as feeding accuracy, glue application uniformity, pressing effect, edge banding peel strength, and joint gap.

 

Preparatory work before operating the edge banding machine includes: cleaning the machine and work area; checking the dust extraction system for proper function; checking the glue tank for sufficient and clean glue, adding glue as needed; adjusting the balance bar position according to the workpiece length and width; adjusting the distance between the upper pressure shaft and lower track according to the workpiece thickness; adjusting the glue gate size; conducting a test run to check if the edge banding machine operates normally; and preparing all materials and accessories. The operating procedure of the fully automatic edge banding machine is as follows: heat the rubber roller to 180℃. When the indicator light is on, turn on other switches. During edge banding, the temperature of the glue pot should be maintained at 180℃±20℃, and the temperature of the glue shaft should be maintained at 200℃±20℃. Load the edge banding material and place the workpiece on the conveyor belt, close to the 90° guide rail baffle, and then push it forward evenly in parallel. For each type of workpiece, a first-piece self-inspection must be performed. Before edge banding irregularly shaped workpieces, use 240# sandpaper to remove burrs. When operating the irregularly shaped edge banding machine, pay attention to applying even force.

Send Inquiry
Send Inquiry